Music Institute

An educational facility for a popular Musicians Institute in Hollywood/ Highland.  1930s’ historical brick wall building was converted into the state of the art performing classrooms.

Area of Work: Approximately 6,980sq.ft. Construction Cost: Approximately $1.2 Mil

Construction Period: Approximately 7 months.

[ SBI Action ]

  • General Contractor
  • Construction Management